CelesTech Infra

CelesTech Infra

Infrastructure Readiness Checklist

Evaluate readiness across the infrastructure lifecycle before a build, migration, or modernization program.

Use this checklist to identify gaps before a major infrastructure initiative. Items marked as gaps are candidates for a structured readiness assessment or scoped engineering engagement.

Print or save this page for internal review. CelesTech can validate findings through a structured Infrastructure Readiness Assessment.

Architecture & Design

  • Current HLD/LLD documentation exists and is reviewed periodically
  • Capacity model covers 12–24 month growth assumptions
  • Failure domains and blast radius are documented
  • Redundancy design matches stated availability requirements
  • Technology choices are justified against workload requirements

Process & Production Readiness

  • SOPs exist for routine operational procedures
  • MOPs exist for planned production changes with rollback steps
  • Change-management workflow includes pre/post validation
  • Production-readiness gates defined for new deployments
  • Operational handoff criteria documented for new systems

Deployment & Validation

  • Migration or turn-up plan exists with phased approach
  • Acceptance test cases defined before deployment begins
  • Rollback procedures tested or validated in documentation review
  • Cross-team RACI defined for deployment events
  • Vendor and internal dependencies identified with owners

Operations & Reliability

  • Incident management process defined with severity levels
  • On-call or escalation paths documented and current
  • Capacity management process exists for key infrastructure domains
  • Upgrade and remediation backlog prioritized and tracked
  • Post-incident review process captures actionable improvements

Observability & Telemetry

  • Critical infrastructure paths have health monitoring
  • Dashboards exist for NOC and engineering troubleshooting
  • Alerts tied to runbooks with clear escalation criteria
  • Capacity and utilization trends visible for planning
  • Telemetry accessible for automation and MCP-based integrations
  • Monitoring gaps identified for high-risk infrastructure domains

Automation, AIOps & AI Governance

  • High-toil operational tasks identified and prioritized
  • Pre-checks and post-checks automated where procedures are mature
  • MCP server integration planned for telemetry and monitoring access
  • AI governance defined for operational tooling (access, audit, approval)
  • AIOps use cases scoped with human-in-the-loop for production changes
  • Automation roadmap aligned to Process → MOP → Automation discipline

Need an expert review?

CelesTech can turn checklist gaps into a prioritized roadmap with defined deliverables and acceptance criteria.